Skip to content
All cities

Davis County · about 6,100

Fruit Heights

Confirm detached with the city

Internal accessory dwellings follow state law. Detached rules should be read in the current Fruit Heights ordinance. Lots of 11,000 sf or larger gain a statewide detached path on October 1, 2026.

Internal ADU
Permitted in most residential zones under House Bill 82.
Detached ADU
Confirm with Fruit Heights planning. From October 1, 2026, lots of 11,000 sf or larger with a house must be able to take a detached ADU as a permitted use.
Lot
Confirm. 11,000 sf is the statewide detached floor from October 1, 2026.
Size
Per ordinance. The ADU cannot exceed the primary dwelling under the 2026 state floor.
Parking
Per ordinance, subject to the 2026 state cap.
Owner occupancy
Owner occupancy is typical. Confirm.
Rental
Long-term occupancy is the usual rule.
Design
Setbacks, height, and coverage remain local. East-bench lots often have slope and access questions we take up on site.

Notes

Hillside lots in Fruit Heights can be more constrained by grade and access than by the ADU table. We walk the site.

Inquire about a lot in Fruit Heights

We verify the ordinance that applies to your parcel as part of feasibility. Fruit Heights City